Sidebar Close

Categories

Your Wishlist

Construction Foam in Jeddah | Construction Foam Supplier Jeddah

FF197 Fire Rated PU Construction Foam for Joint Sealing

33 People Visited 81 hours Spent
Buy Construction Foam in Jeddah from Nassguard. FF197 fire-rated PU foam for specified door-frame and joint seals. Supply across Riyadh, Dammam, Jubail and Al Khobar.
Pickup available at Address Usually you will quote for Enquiries within 3-12 Hours Contact to the Showroom

Product Details

Construction Foam in Jeddah | Construction Foam Supplier Jeddah



Construction Foam in Jeddah from Nassguard includes FF197 Fire Rated PU Construction Foam, a single-component polyurethane foam for sealing suitable door-frame gaps and linear joints in fire-rated construction. It expands after application and cures into a semi-rigid seal.

Nassguard supplies FF197 construction foam across Jeddah, Riyadh, Dammam, Jubail and Al Khobar. It suits contractors and maintenance teams who need a gap-filling product with tested fire performance, provided the installation matches the appropriate joint or doorset configuration.

What Is FF197 Fire Rated PU Construction Foam?

FF197 is a modified, single-component polyurethane foam designed for specified construction joints and frame-perimeter seals. Its expanding action helps fill irregular spaces that would otherwise be difficult to seal uniformly.

The cured foam contributes to the performance of a tested fire-sealing assembly. However, the achievable fire resistance depends on the wall or floor construction, joint width, foam depth and any required finishing sealant.

Selected linear-joint arrangements achieve up to four hours of fire resistance. This rating does not apply automatically to every gap filled with FF197.

Key Features of FF197 Construction Foam

FF197 PU foam combines convenient application with tested performance for suitable building-joint details.

  • Single-component formulation: Requires no separate component mixing before application.
  • Expanding gap filler: Helps fill suitable frame perimeters and linear construction joints.
  • Tested fire resistance: Achieves up to 240 minutes in specified linear-joint configurations.
  • Door-frame applications: Supports assessed fire-door perimeter details, including selected gaps up to 35mm.
  • Gun or nozzle application: The 2-in-1 canister allows application using a suitable foam gun or nozzle.
  • Fast surface skin formation: Becomes tack-free in approximately 10 minutes under suitable conditions.
  • Acoustic performance: Offers up to 62dB in tested arrangements.
  • Thermal insulation: Helps reduce heat transfer through the filled joint.

Applications of Construction Foam in Jeddah

FF197 Fire Rated PU Construction Foam supports gap sealing where the construction detail falls within its tested or assessed application scope.

  • Fire-door installation in Jeddah: Seal approved gaps between door frames and surrounding construction.
  • Commercial projects in Riyadh: Complete specified linear-joint seals within fire-rated areas.
  • Industrial buildings in Dammam: Support suitable joint-sealing details during construction and refurbishment.
  • Facility upgrades in Jubail: Replace damaged or incomplete seals using an appropriate assessed detail.
  • Fit-out projects in Al Khobar: Seal suitable frame perimeters within compartmentation works.
  • Schools and healthcare buildings: Support specified fire-sealing arrangements around suitable openings.
  • Residential developments: Fill approved construction gaps during installation and finishing.
  • Maintenance projects: Repair existing seals after checking the substrate, dimensions and required fire performance.

FF197 is a fire-rated joint-sealing foam. For waterproofing for basement construction, specify a dedicated waterproofing system designed for the expected water exposure and pressure.

Standards and Tested Fire Performance

Preparing and Sealing Construction Joints

A dependable construction seal requires correct preparation and a joint detail that matches the required performance.

  • Confirm the joint arrangement: Check the substrate, orientation, width, depth and required fire rating.
  • Check additional components: Include finishing sealants or backing materials wherever the assessed detail requires them.
  • Clean the surfaces: Remove loose particles, dust, grease and unstable material.
  • Protect adjacent finishes: Mask areas that must remain free of expanding foam.
  • Check application temperatures: Keep both the work area and canister within their specified limits.
  • Apply with controlled flow: Allow for expansion and avoid leaving concealed voids.
  • Allow sufficient curing: Trim only when the foam is ready, without reducing the required seal depth.
  • Complete the specified finish: Protect or cover the foam as required by the installation detail.

Use suitable protective equipment and ventilation during application. The pressurised aerosol is flammable, so keep it away from ignition sources.

Inspection, Maintenance and Storage

Routine checks help preserve the condition of fire-rated construction seals.

  • Inspect for gaps, separation or damage after installation.
  • Record the joint location and installation detail for future maintenance.
  • Reinspect after nearby alterations, including frame replacement or building work.
  • Repair using a compatible assessed arrangement, rather than adding an unspecified filler.
  • Check expiry dates before using stored canisters.
  • Store in a cool, dry location within the specified temperature range.
  • Avoid hot vehicles and direct sunlight, particularly during Saudi summer conditions.

Why Choose Nassguard for Construction Foam in Jeddah?

Nassguard supports FF197 construction foam enquiries for contractors, fit-out companies and maintenance departments.

  • Product-specific quotations: Request FF197 with your required quantity and delivery location.
  • Application details: Provide joint dimensions and required fire performance when enquiring.
  • Project purchasing: Coordinate foam and any specified complementary sealing products.
  • Saudi supply coverage: Enquire from Jeddah, Riyadh, Dammam, Jubail and Al Khobar.

Frequently Asked Questions

1. What is FF197 construction foam used for?
It seals suitable door-frame perimeters and linear joints within assessed fire-rated construction details.

2. Does every FF197 installation provide four-hour protection?
No, up to four hours applies only to qualifying tested joint configurations.

3. Can it replace basement waterproofing?
No, basement waterproofing requires a dedicated system suitable for water exposure and pressure.

4. Can FF197 be applied with a nozzle?
Yes, its 2-in-1 canister supports suitable gun or nozzle application.

5. How quickly can I cut the foam?
The indicative cutting time is approximately 60 minutes, depending on conditions.

6. Is foam alone suitable for every fire-door rating?
No, some arrangements require additional sealant and specific frame, wall and joint dimensions.

7. Where can I buy FF197 construction foam in Jeddah?
Contact Nassguard for quotations and supply enquiries across Jeddah and other Saudi locations.

Conclusion

FF197 Fire Rated PU Construction Foam provides an expanding gap-filling solution for specified frame perimeters and linear joints. Its application flexibility, thermal properties and tested fire performance make it useful when the installation matches the required construction detail.

For Construction Foam in Jeddah, contact Nassguard with your joint dimensions, required rating and quantity. Correct selection, controlled application and careful inspection help maintain the intended performance of the completed seal.

Technical Information

Technical Specifications of FF197 construction foam

SpecificationDetails
Product codeFF197
Product typeFire-rated PU construction foam
CompositionSingle-component polyurethane
Cured formSemi-rigid foam
Linear-joint fire performanceUp to 240 minutes, configuration-dependent
Application methodSuitable foam gun or nozzle
Application ambient temperature+5°C to +35°C
Canister temperature for application+10°C to +30°C
Typical density20–30kg/m³
Indicative foam yieldApproximately 45 litres, depending on conditions
Tack-free timeApproximately 10 minutes
Cutting timeApproximately 60 minutes
Thermal conductivity0.036W/m·K
Tensile strength81kPa
Shear strength57kPa
Compression strength at 10%47kPa
Storage temperature+5°C to +25°C, in dry conditions
Shelf life12 months in original, unopened containers
Halo Product

Loremour De Saliduar Cosmopolis

$286.00

Notify Me

Subscribe

Edit Option

Color: Pink
Size: XS
Material: Option 1
(Product 4) Sample - Clothing And Accessory Boutiques For Sale
Color: Pink
Size: XS
Material: Option 1

Size Chart

Have Questions?

Ask The Fashion Expert Anything On Ella

We will follow up with you via email within 24-36 hours

Please answer the following questionnaire

Compare Color

Click On Color / Pattern To Compare, Click And Drag Images To Reorder
Login
Inquiry Cart
0 items
Menu